1999/00 Rules and Vehicle Design Specification
Judging:
For the 1999/00 contest year aircraft will be designed
to complete multiple mission sorties within a timed flight period.
Each team must also submit a written Design Report, which is divided
into two phases as noted in the documentation requirements section.
A maximum of 100 points will be awarded for the team design report.
(One score will be given accounting for both sections.) Scores
for the written reports will be announced at the beginning of
the fly-off.
The overall team score is a combination of the paper and flight
scores. The team with the highest overall team score will be declared
the winner.
Contest Site:
Host for the competition will be Cessna Aircraft Company.
The fly-off will be held in Wichita
Kansas. It is highly recommended that teams consider Wichita weather
(wind) conditions during the aircraft design phase.
Team Requirements:
All team members (except for a pre-approved designated
pilot) must be full time students at an accredited University
or College and student members of the AIAA. The team must be composed
of both under classmen and upper classmen, with at least 1/3 of
the members being under classmen (Freshman, Sophomores or Juniors).
The pilot must be an AMA (Academy of Model Aeronautics) member.
Teams may use a non-university member for the pilot if desired.
Such a designated pilot must be from the team's local area, and
pre-approved by the contest officials. We will also provide qualified
pilots on the contest day for any teams who are unable to have
their pilot attend.
Technical Assistance:
A non-exclusive list of some available suppliers for
materials, R/C systems, electric motors and NiCad batteries is
included in this package.
Past Reports:
A compendium of the entry technical reports from prior-year
competitions is published by ONR through the NTIS. Individual
entry reports are also available by request from the AIAA. All
reports submitted become the property of AIAA, ONR, and Cessna.
Preferred access to the prior-year reports is through NTIS, However,
individual reports may also be requested from AIAA (AIAA policy
is to make all student competition reports available). Teams outside
the US may not have access to the NTIS reports, so may need to
contact AIAA for copies.
1996/97 Report:
2031840 NTIS Accession Number: AD-A329 477/4/XAB
Support of AIAA Student Aircraft Design/Fly Competition
(Final rept. 1 Apr-31 Dec 97)
Sponsorship:
Teams may solicit and accept sponsorship in the form
of funds or materials and components from commercial organizations.
All design, analysis and fabrication of the contest entry is the
sole responsibility of the team members.
Schedule:
A completed entry form (electronic) is due to the contest
administrator on or before 31 October 1999. Written reports
for the PROPOSAL PHASE (5 copies), are due to the
chief of scoring by COB 13 March 2000. Written reports
for the ADDENDUM PHASE (5 copies), are due to the
chief of scoring by COB 10 April 2000. Scores for the written
reports will be announced at the beginning of the fly-off. The
contest is scheduled for 22-23 April 2000.
Late submissions will not be judged. Teams who do not submit the
required written reports will not be allowed to fly.
Communications:
The contest administration will maintain a World Wide
Web site containing the latest information regarding the contest
schedules, rules, and participating teams. The contest web site
will also contain a list of potential suppliers for materials
and equipment available to build an entry. The contest web site
is located at:
http://www.aae.uiuc.edu/aiaadbf
All teams are required to provide a single point-of-contact e-mail
address with their contest application.
Questions regarding the contest, schedules, or rules interpretation
may be sent to the contest administrator by e-mail at:
gregory.s.page@nrl.navy.mil
The contest administrator will provide copies of all questions
received and their answers to all teams of record.
Written reports (only) should be sent to the chief of scoring
at:
Dr. David W. Levy
Cessna Aircraft Co
5701 E. Pawnee, MS 178 P
Wichita, KS 67218
email: dlevy@CESSNA.TEXTRON.COM
PHONE: (316) 831-2520
FAX: (316) 831-2828
Aircraft Requirements - General
- The aircraft may be of any configuration except rotary wing
or lighter-than-air.
- Maximum wing span is 7 feet.
- Must be propeller driven and electric powered with an unmodified,
over the counter model
electric motor. May use
multiple motors and/or propellers. May be direct drive or with
gear or belt reduction. For safety, each aircraft will use a commercially
produced propeller. Teams may modify the propeller diameter by
clipping the tip.
- Must use over the counter NiCad batteries. For safety, battery
packs must have shrink-wrap or other protection over all electrical
contact points. The individual cells must be commercially available,
and the manufacturers label must be readable (i.e. clear shrink
wrap preferred).
- Maximum battery pack weight is 5.0 lb. Battery pack must power
propulsion and payload systems. Radio Rx and servos (only) may
be on a separate battery pack. Batteries may not be changed between
sorties during a flight period.
- Aircraft and pilot must be AMA legal. This means that the
aircraft TOGW (take-off gross weight with payload) must be less
than 55 lb., and the pilot must be a member of the AMA. Since
this is an AMA sanctioned event, the team must submit proof that
the aircraft has been flown prior to the contest date (in flight
photo or video).
The pilot need not be a student at the represented university.
Application for approval of a non-student pilot must be presented
to the contest administrator for approval at least one month prior
to the written report, PROPOSAL PHASE submission.
Aircraft Requirements - Safety
All vehicles will undergo a safety inspection by a designated
contest safety inspector prior to being allowed to make any competition
or non-competition (i.e. practice) flight. All decisions of the
safety inspector are final. Safety inspections will include the
following as a minimum.
- Physical inspection of vehicle to insure structural integrity.
- Verify all components adequately secured to vehicle. Verify
all fasteners tight and have either safety wire, lock-tite (fluid)
or nylock nuts.
- Verify propeller structural and attachment integrity.
- Visual inspection of all electronic wiring to assure adequate
wire gauges and connectors in use. Teams must notify inspector
of expected maximum current draw for the propulsion system.
- Radio range check, motor off and motor on.
- Verify all controls move in the proper sense.
- Check general integrity of the payload system.
- Structural verification. All aircraft will be lifted with
one lift point at each wing tip to verify adequate wing strength
(this is equivalent to a 2.5g load case) and to check for vehicle
cg location. Teams must mark the expected empty and with payload
cg location on the exterior of the aircraft fuselage. Special
provisions will be made at the time of the contest for aircraft
whose cg does not fall within the wing tip chord. This test will
be made with the aircraft filled to its maximum payload
capacity (Teams must inform the inspector and judges of
their maximum design capacity and must make all flights within
that capacity).
- Radio fail-safe check. All aircraft radios must have a fail-safe
mode that is automatically selected during loss of transmit signal.
The fail-safe will be demonstrated on the ground by switching
off the transmit radio. During fail safe the aircraft receiver
must select:
- Throttle closed
- Full up elevator
- Full right rudder
- Full left aileron
- Full Flaps down (if so equipped)
The radio Fail Safe provisions will be strictly enforced.
- All aircraft must have a mechanical motor arming system separate
from the onboard radio Rx switch. This may be a mechanical switch
rated for the maximum current draw accessible from outside the
aircraft, or can be a removable link such as an automotive "blade"
style fuse. The aircraft Rx should always be powered on and the
Tx throttle verified to be "closed" before activating
the motor arming switch.
Mission Profile:
For the 1999/00 DBF contest, teams will alternate
between two different sorties (flights) - a short-field cargo
sortie and a cruise/ferry sortie. Teams may fly as many sorties
as desired within the flight period, but must alternate between
the sorties. Either sortie may be flown first. Each sortie will
be assigned a score based on the table below. Note that only the
short-field cargo sortie yields scoring points. The Single
Flight Score is the sum of the score(s) for the individual
sorties flown during a single flight period. The best three Single
Flight Scores (may be reduced to two if restricted by
weather) for each team will be summed for the team's Total
Flight Score.
Each team's overall score will be computed from their Written
Report Score, Total Flight Score, and the
Rated Aircraft Cost using the formula:
SCORE = Written Report Score * Total Flight Score
Rated Aircraft Cost
Rated Aircraft Cost must be documented and
included in the Addendum Report provided prior to the competition.
(If not provided, a value of 100 will be used.)
Sortie Matrix
| No. | Score | Description
|
| 1 | 10*n | Short Field Cargo Sortie
- Carry 'n'-liters of water one lap of course. Water is to be carried in polyethylene 1 liter round bottles (full bottles only).
- Short field take-off (100 ft Max)
- Minimum aircraft capacity is 2 liters (may fly less than minimum capacity). Maximum aircraft capacity is 8 liters (may NOT fly more than maximum capacity). Aircraft structural test will be conducted at individual aircraft's maximum physical capacity.
- All payload must be carried internally in a fully faired, fully closed structure.
- Aircraft must complete a 360o turn in the direction opposite of the base and final turns on each downwind leg.
|
| 2 | No Score | Cruise/Ferry Sortie
- Aircraft must complete 2 full laps of the course with no payload. This non-scoring return task must be completed before attempting another scoring sortie of task #1.
- Short field take-off (100 ft Max)
- 360 degree turn on downwind is not required for this task.
|
Aircraft Cost Model
Rated Aircraft Cost, $ (Thousands) = (A*MEW + B*REP +
C*MFHR)/1000
| Coef. | Description | Value
|
| A | Manufacturers Empty Weight Multiplier
| $100 / lb. |
| B | Rated Engine Power Multiplier
| $1 / watt |
| C | Manufacturing Cost Multiplier
| $20 / hour |
| MEW | Manufacturers Empty Weight
| Actual airframe weight, lb., without payload or batteries
|
| REP | Rated Engine Power |
# engines * 50A * 1.2 V/cell * # cells |
| MFHR | Manufacturing Man Hours
| Prescribed assembly hours by WBS (Work Breakdown Structure).
MFHR = S WBS hours
WBS 1.0 Wing(s):
5 hr./wing.
+ 4 hr/sq. ft. Projected Area
WBS 2.0 Fuselage and/or pods
5 hr/body.
+ 4 hr/ft of length
WBS 3.0 Empenage
5 hr.(basic)
+ 5 hr./Vertical Surface
+ 10 hr./Horizontal Surface
WBS 4.0 Flight Systems
5 hr.(basic)
+ 1 hr./servo
WBS 5.0 Propulsion Systems
5 hr./engine
+ 5 hr./propeller or fan
|
Since the contest requires multiple sorties during each flight
period; ground handling, take-off and landing are paramount design
considerations.
- Teams may fly multiple sorties within a 10
minute flight period. For each new sortie the team
must switch to the opposite task. The time to unload and reload
the payload for the next sortie is part of the flight period.
- Aircraft will be brought to the flight line to begin the flight
period with the payload for the first sortie (mission task) already
loaded. Teams will be given a maximum of 2 minutes to place their
aircraft on the starting line and prepare for competition before
the judges start the timed flight period.
- The aircraft payload must be emptied or reloaded before each
additional sortie. Aircraft propulsion system(s) must be disarmed
or "safed" during all payload changes.
- Sorties may be repeated as many times as possible provided
the aircraft has passed the downwind turn pylon
before the time limit for the flight period ends.
- Maximum flight support crew is: pilot, observer and 3 ground
crew. Only the designated ground crew may conduct the unloading/reloading.
Pilot and observer may be members of the ground crew, provided
total ground crew size remains 3 people.
- The upwind turn will be made after passing the upwind pylon.
The downwind turn will be made after passing the downwind pylon.
Upwind and downwind pylons will be 500 feet from the starting
line. Aircraft must be "straight and level" when passing
the pylon before initiating the turn.
- Aircraft must land on the paved portion of the runway. Aircraft
may "run-off" the runway during roll-out.
- After landing, aircraft will taxi back to the starting line
to unload their payload, and reload for the next sortie. Wing-Walkers
are allowed to accompany the plane during the taxi, but must wait
at the starting line until the aircraft comes to a complete stop
before going to assist the aircraft.
- Aircraft that run off the runway during landing may be carried
back to the runway by the ground crew to taxi back to the starting
line. Aircraft that leave the runway will be returned to the runway
at the nearest possible location.
- Aircraft unable to taxi back to the starting line due to landing
damage may be carried by the designated ground crew. Ground crew
members will not be allowed to leave the starting line to retrieve
the aircraft until the aircraft has stopped.
- Aircraft experiencing minor landing damage may be repaired
and fly additional sorties within the flight period. Repairs must
be made on the starting line, and may not begin until the payload
has been unloaded. Repairs must be completed before the payload
is reloaded for the next sortie. All team members may assist in
repairs, only ground crew members may reload the aircraft.
- Aircraft will be considered to have only minor damage
if they can be repaired and presented as flight worthy within
30 minutes of the end of that flight period. Aircraft with only
minor damage will be credited with their full Single
Flight Score.
- Aircraft which can be repaired during the competition, but
not within 30 minutes of the flight period, will NOT be credited
with a score for the last sortie flown, but will receive full
credit for any prior sorties.
- Flight altitude must be sufficient for safe terrain clearance
and low enough to maintain good visual contact with the aircraft.
Decisions on safe flight altitude will be at the discretion of
the flight line judges and all rulings will be final.
Additional information is included in the FAQ (Frequently Asked
Questions).
Design Report:
Each team will submit a judged design report as outlined below.
The design report will be submitted in two sections. Submission
dates are contained in the schedule section of this document.
Reports must be bound in some manor (simple spiral bindings are
sufficient and preferred, 3-ring binders are discouraged). Both
the Proposal and Addendum reports must contain the same cover,
title page, and table of contents. All information used for scoring
must be in the outlined sections. Sections exceeding the page
limits will be scored as "zero". Appendices may
be included if desired, but WILL NOT BE INCLUDED DURING
JUDGING.
Design Report-PROPOSAL PHASE
- Executive Summary: (Maximum 3 pages, 5 points): Provide a
summary of the development of your design. This should be a narrative
description highlighting the major areas in the development process
for your final configuration and a broad description of the range
of design alternatives investigated. Include an overview of the
design tools used for each phase of the design development: conceptual
design, preliminary design, and detailed design.
- Management Summary (Maximum 2 page, 5 points): Describe the
architecture of the design team. Provide a list of design personnel
and assignment areas. Document the management structures used
for personnel assignments, schedule control, and configuration
control. Include a (single) milestone chart showing planned and
actual timing of major elements of the design process, including
as a minimum the conceptual design stage, preliminary design stage,
detailed design stage, and report preparation periods.
- Conceptual Design (Configuration Selection, Maximum 10 pages,
20 points): Document the alternative concepts investigated during
the conceptual design stage. Detail the design parameters investigated,
and why each was felt to be important. Describe the figures of
merit (FOM's) used to screen competing concepts, and the mission
feature each FOM was selected to support. Include the value
for Rated Aircraft Cost assigned to each concept
during the FOM screening process. Describe the analytic methods
used during the conceptual design stage, the expected accuracy
and why each was selected for this design phase. Numerical data
need not be extensive at this stage, but should include as a minimum
a final ranking chart giving the quantitative value of each design
for each FOM, the FOM importance factors or ranking, and an explanation
of the features that produced the final configuration selection.
- Preliminary Design (Performance Estimation and Vehicle Sizing,
Maximum 5 pages, 20 points): Document the design parameter
and sizing trades investigated during the preliminary design stage.
Detail the design parameters investigated, and why each was felt
to be important. Describe the FOM's used and the mission or design
feature each FOM supports. Describe the analytic methods used
during the preliminary design stage, the expected accuracy and
why each was selected for this design phase. Numerical data will
be more extensive at this stage, and should include as a minimum
configuration and sizing parameter values sufficient to justify
the selection of the final value chosen for each of the major
design and sizing parameters. Include a summary of the key features
that distinguish the final configuration.
- Detail Design (Final Design, Drawings and Performance Predictions,
Maximum 10 pages Plus Drawing Package, 20 points): Final performance
data should be provided for the design, including take off performance,
handling qualities and g load capability, range and endurance,
and payload fraction. Component selection and systems architecture
should be included in this section. The Drawing Package must contain
as a minimum a 3-view drawing of the design in sufficient
detail to indicate aircraft size and configuration, primary structure
component size and location, and location of propulsion and flight
control system components.
- Manufacturing Plan (Materials Selection and Fabrication Processes,
Maximum 5 pages, 10 points): Document the process selected
for manufacture of major components and assemblies of the final
design. Detail the manufacturing processes investigated, and describe
the FOM's used (including but not limited to: availability, required
skill levels and cost) to screen competing concepts. Describe
the analytic methods (cost, skill matrix, scheduling time lines)
used to select the final set of manufacturing processes. Include
a manufacturing milestone chart showing scheduled event timings.
Design Report-ADDENDUM PHASE
- Lessons Learned (Maximum 5 pages, 10 points): Document any
areas where the final contest aircraft differs from the PROPOSAL
design. Also identify areas for improvement in the next design
and manufacturing process implementation.
- Aircraft Cost (Maximum 5 pages plus table, 10 points) Document
your final competition aircraft's Rated Aircraft Cost
using the contest supplied cost model. Provide a table indicating
values for each airframe dependent parameter in the cost model.
Provide a table listing manufacturing hours broken down by the
supplied WBS structure.
Notes:
· Page counts do not include figures
or tables. Figures and tables should be placed at the end
of the text for a given section.
[Top] [AIAA Student Design/Build/Fly Competition homepage][AIAA Homepage]
Webmaster m-selig@uiuc.edu